Motor Control
Centre, Form 4 Construction, Integral ICA cubicle with Allen Bradley
PLC, SCADA and telemetry monitoring equipment.
Centre
controls & monitors a complete water treatment works
including Pressure GAC filter cleaning routines, Chlorination and Residual,
monitoring/shutdown systems |
 |
Motor Control
Centre, Form 4 Construction, Integral ICA cubicle with Allen Bradley
PLC, SCADA and telemetry monitoring equipment.
Centre
controls & monitors a complete water treatment works
including Borehole Extraction, water tower storage, Pressure filter cleaning routines, Chlorination, Residual,
monitoring/shutdown systems |
 |
Mains Incomer/Generator Incomer
changeover cubicles of a motor control centre. |
 |
Auto Transformer starter cubicles
for Borehole pumps including individual Power factor correction. |
 |
Control Panels with Allen Bradley
PLC for controlling a section of Power generation plant at the Cayman Islands Power
Station, including integral Air Conditioning Units to work in extreme heat zone. |
 |
Control Panel internal layout
showing integral Battery packs/Charger compartment for UPS of PLC control system. |
 |
Control Panel internal layout
showing PLC and trunking systems. |
 |
Multi-compartment motor control
centre complete with ICA section, ASTA Certified Busbar system, Form 4 construction for
the control of a Water treatment plant including Pressure sand filters, Chlorination
dosing, remote monitoring of Water tower for Booster pump controls, Borehole starters and
Transfer pumping systems. |
 |
Instrumentation Control panels
used for controlling a Water treatment works at Abu Dhabi Airport, using Active Mimic
Displays and Interactive controls via either panel at two locations connected by a
FSK telemetry system, which allows operator control from either location. |
 |
Pneumatic control panel for
hazardous area use in a drugs manufacturing complex. |